B6.7 CM2350
05-03-2023, (Subject: B6.7 CM2350 ) 
Post: #8
RE: B6.7 CM2350
Program matches the S/N and is the latest calibration
We get 1921 then 1922 if we reset the ash load to 0
Doser injector has been replaced this repair
I will get a screen shot of regen history
We have checked wiring by inspecting and load testing circuits, checked pins in connectors for tension. [/color]
replyreply


Messages In This Thread
B6.7 CM2350 - kunzme - 05-02-2023,
RE: B6.7 CM2350 - Rawze - 05-02-2023,
RE: B6.7 CM2350 - kunzme - 05-02-2023,
RE: B6.7 CM2350 - Rawze - 05-03-2023,
RE: B6.7 CM2350 - kunzme - 05-03-2023,
RE: B6.7 CM2350 - Rawze - 05-03-2023,
RE: B6.7 CM2350 - kunzme - 05-03-2023
RE: B6.7 CM2350 - Rawze - 05-03-2023,
RE: B6.7 CM2350 - kunzme - 05-03-2023,
RE: B6.7 CM2350 - DVT873 - 05-04-2023,



NOTE: Rawze.com is not affiliated, nor endorses any of the google ads that are displayed on this website.